The ANJELMS Project

  • To Inspire And Get Inspired - Conor

    To Inspire And Get Inspired - Conor
    Conor and Marani are a dynamic duo based in Walyalup - Fremantle. Both young, expressive, culturally and ethically conscious individuals. We imagine these two are the driving force of what the emerging youth endeavour to embody, especially when wearing The ANJELMS Project Clothing.
    Weiterlesen
  • To Inspire And Get Inspired - Marani

    To Inspire And Get Inspired - Marani
    Conor and Marani are a dynamic duo based in Walyalup - Fremantle. Both young, expressive, culturally and ethically conscious individuals. We imagine these two are the driving force of what the emerging youth endeavour to embody, especially when wearing The ANJELMS Project Clothing.
    Weiterlesen
  • Waste Not Want Not Quilts

    Waste Not Want Not Quilts
    We are very thankful to bring you this amazing collection of unique quilts, each hand-stitched by the Stitching Ladies of The Stitching Project as well as numbered, catalogued and hand-signed. These quilts are part of our Waste Not Want Not collaboration project with The Stitching Project using off-cuts from our clothing collections, giving them new purpose and creating employment for the team of the Project, especially during this challenging times.
    Weiterlesen
  • Made By Hand

    Made By Hand
    What a rollercoaster the last few months have been for all of us! So much so that it has taken us that long to properly introduce you to our new collection “Made By Hand”.
    Weiterlesen
Liquid error (sections/static-blog line 62): Could not find asset snippets/spurit_dmr_collection_template_snippet.liquid